检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:宋岱锋[1] 陈辉[1] 贾艳平[2] 杜建伟[1] 韩鹏[1] 张岩[1]
机构地区:[1]中国石油化工股份有限公司胜利油田分公司孤岛采油厂,山东东营257231 [2]中国石油大学石油工程学院,山东东营257061
出 处:《海洋石油》2008年第2期101-104,共4页Offshore Oil
摘 要:选择特征波长为450nm的荧光物质作为示踪剂来寻找油水井间的窜流通道,通过静态吸附试验计算出荧光示踪剂在岩石中的吸附损失量和估算试验区块地下水体体积,从而计算出注水井所需的示踪剂用量。现场试验注入267m3浓度为15mg/L的荧光示踪剂溶液,历时40h,从15N9注水井注入后,在对应的14口生产井上取水样进行检测,结果表明其中4口井间存在高渗透带或窜流通道。在15N9井调剖后,注水压力由6.0MPa上升到12.5MPa,对应生产井平均单井日增油3.5t,含水下降9.55%。Fluorescent material with characteristic wave-length of 450 nm is used as tracer to look for the flee-flowing channel between production wells and injection wells. The quantity of tracers can be calculated by static adsorption experiments and the estimation of the groundwater volume in test area. The 267 m^3 solution with the fluorescence tracer concentration of 15 mg/L was injected to 15N9 well, and the time of injection was 40 hours. The water sample from the corresponding 14 production wells was checked. The result showed that high permeable zone or flee-flowing channel existed in 4 production wells. The initial injection pressure of 15N9 well is 6.0 MPa, and after profile control it can reach to 12.5 MPa. The extra oil production of the corresponding production wells can be 3.5 t for a single well everyday, and the water content ratio decreased by 9.55 %.
分 类 号:TE331.1[石油与天然气工程—油气田开发工程] TE357.8
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.180