检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]兰州交通大学土木工程学院,甘肃兰州730070
出 处:《水利与建筑工程学报》2008年第3期47-50,共4页Journal of Water Resources and Architectural Engineering
摘 要:国家重点工程西部管道工程兰州原油末站超大型油罐群,是我国首次在高饱和度黄土地基修建的超大型储油设施。由于高饱和度黄土地基天然承载力过低,仅为60 kPa,油罐区地基采用CFG桩复合地基进行处理。通过现场CFG单桩及单桩复合地基静载荷试验,确定复合地基承载力,并对该种地基处理方法进行评述,为该地区地基处理积累了工程经验。The large oil tank group in Lanzhou, which is a part of the state key project - the western oil pipe line project, is constructed on the saturated loess stratum for the first time in China. Due to lack of bearing capacity, the CFG method is used in the foundation treatment of the saturated loess. Through the in-situ tests for the CFG single pile and the static loading, the bearing capacity of the composite foundation is defined, and the foundation treatment method is discussed to provide references for similar projects.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145