检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《建筑技术》2008年第7期521-524,共4页Architecture Technology
摘 要:对空间大跨度组合扭壳屋盖结构的施工过程从屋盖的空间定位、内架的搭设、钢筋的安放与绑扎、混凝土的浇筑、预应力筋的张拉及内架的拆除等方面进行详细阐述,通过采用空间三维坐标控制技术、合理的支撑体系设计、对钢筋绑扎及预应力筋的精确定位、混凝土浇筑区域的合理划分及确定拆模顺序等,为实现设计意图、满足功能要求及保障施工期的安全奠定良好的基础。Introduction is made on the construction process of a big-spanned hyperbolic paraboloid combined shell roof, tion of reinforced internal support and formwork. The adoption of three-dimensional coordinate control, rational design of bracing system, precise positioning of reinforcement work and prestressed bar and the reasonable division of concrete placement sections as well as definite sequence of formwork removal, have laid a good base for realizing the designer's intention, satisfying the functional requirments and ensuring the construction safety.
分 类 号:TU756[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28