检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]河海大学建筑工程系
出 处:《河海大学学报(自然科学版)》1990年第4期87-92,共6页Journal of Hohai University(Natural Sciences)
摘 要:本文用钢筋混凝土非线性有限元方法分析了龙羊峡水电站坝内钢管模型,得出了与模型试验相同的结果,从而说明了该方法及所用程序的可靠性.在此基础上,针对现行坝内钢管结构联合承载设计中存在的问题,用非线性有限元方法对该类结构进行了大量分析计算,弄清了它的受力特征,提出了联合承载的极限状态设计法.By using the nonlinear finite element method for reinforced concrete structures, the model of the penstock in the Longyangxia Dam has been analyzed in this paper, and the results are in good agreement with those from model test. Therefore, the relaiblity of this method and of computer program used in this paper has been verified. On this basis, many caculations of penstocks in concrete dams have been done with this program to analgze the existing design method for the joint resistance of penstoch and its reinfoced encasement against the internal pressure and to find the mechanism of the joint resistance of such structures. Then, the limit state design procedure has been developed.
分 类 号:TV732.41[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.90