检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:初曰亭
出 处:《水力发电》2008年第6期65-66,73,共3页Water Power
摘 要:龙滩水电站是我国21世纪开工建设的巨型水电工程,在水轮发电机组等关键设备生产制造上带头走出了一条依靠民族工业的模式,即采用主机设备在国内公开招标采购,而某些关键技术上由国外著名厂商提供技术支持来进行合作,并在工程实践中大胆采用新技术和新工艺,在设备安装和生产运行方面也探索走出了新路子。The Longtan Hydropower Station is a huge scale hydro project which was started to build in 21st century in China. The production and manufacturing of its main equipment of hydro-generating unit took the initiative of new mode of depending on national industry, that is, a cooperation production and manufacturing mode which the equipment of main machine were purchased through opening bidding at home but the technical support of some key technologies were supplied by foreign manufacturer. Meanwhile new technologies and techniques have been boldly adopted in the project practice. And new road also has been explored in the aspects of equipment installation and production operation.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222