SUSPENDED SEDIMENT TRANSPORT IN THE OFFSHORE NEAR YANGTZE ESTUARY  被引量:15

SUSPENDED SEDIMENT TRANSPORT IN THE OFFSHORE NEAR YANGTZE ESTUARY

在线阅读下载全文

作  者:CHEN Bin WANG Kai 

机构地区:[1]Institute of Oceanology, Chinese Academy of Sciences, Qingdao 266071, China [2]Graduate University of the Chinese Academy of Sciences, Beijing 100039, China

出  处:《Journal of Hydrodynamics》2008年第3期373-381,共9页水动力学研究与进展B辑(英文版)

基  金:the National Natural Science Foundation of China (Grant No.40576017);the National Basic Research Program of China (973,Program, Grant No.2007CB411804)

摘  要:Based on the Estuarine, Coastal and Ocean Modeling System with Sediments (ECOMSED) model, a 3-D hydrodynamic-transport numerical model was established for the offshore area near the Yangtze Estuary in the East China Sea .The hydrodynamic module was driven by tide and wind. Sediment module included sediment resuspension, transport and deposition of cohesive and non-cohesive sediment. The settling of cohesive sediment in the water column was modeled as a fimction of aggregation (flocculation) and deposition. The numerical results were compared with observation data for August, 2006. It shows that the sediment concentration reduces gradually from the seashore to the offshore area. Numerical results of concentration time series in the observation stations show two peaks and two valleys, according with the observation data. It is mainly affected by tidal current. The suspended sediment concentration is related to the tidal current during a tidal cycle, and the maximum concentration appears 1 h-4 h after the current maximum velocity has reached.Based on the Estuarine, Coastal and Ocean Modeling System with Sediments (ECOMSED) model, a 3-D hydrodynamic-transport numerical model was established for the offshore area near the Yangtze Estuary in the East China Sea .The hydrodynamic module was driven by tide and wind. Sediment module included sediment resuspension, transport and deposition of cohesive and non-cohesive sediment. The settling of cohesive sediment in the water column was modeled as a fimction of aggregation (flocculation) and deposition. The numerical results were compared with observation data for August, 2006. It shows that the sediment concentration reduces gradually from the seashore to the offshore area. Numerical results of concentration time series in the observation stations show two peaks and two valleys, according with the observation data. It is mainly affected by tidal current. The suspended sediment concentration is related to the tidal current during a tidal cycle, and the maximum concentration appears 1 h-4 h after the current maximum velocity has reached.

关 键 词:Yangtze Estuary sediment concentration sediment transport 

分 类 号:TV148[水利工程—水力学及河流动力学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象