检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]天津市水文水资源勘测管理中心,天津300061 [2]广东省水文局广州分局,广东广州510150
出 处:《水利水电技术》2008年第7期75-77,81,共4页Water Resources and Hydropower Engineering
基 金:天津市水利科学技术基金项目(KY2004-08)
摘 要:在分析天津市区暴雨时空分布特征的基础上,建立了市区暴雨公式,推求了设计暴雨过程。结果表明:天津市实测最大点雨量主要集中在7月下旬~8月上旬这段时间,且不同时段实测最大点雨量在时间分布上比较集中。市区暴雨的强度较大,已达到大暴雨级别。市区设计暴雨过程的估算,可为相关部门的除涝规划提供依据。Based on the analysis on the spatial and temporal distribution features of rainstorm in the urban district of Tianjin, the rainstorm formula is established and then the design rainstorm process is derived, The result shows that the maximum measured point precipitations are concentrated in the period from the last ten-day of July to the first ten-day of August, and the maximum point precipitations measured in different periods of time are more concentrated for the temporal distribution, of which the intensity of the rainstorm is larger in the urban district and has already reached the level of heavy rainstorm. This estimation on the process of the design rainstorm in the urban district can provide a basis for making the water-logging control planning by the authorities concerned.
分 类 号:TV125[水利工程—水文学及水资源]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.223.125.111