非同期合闸对发电机-变压器组差动保护的影响及解决措施  被引量:3

Impact of Non-synchronization Closing to Generator-transformer Unit Differential Protection and the Solutions

在线阅读下载全文

作  者:许扬[1] 陆于平[1] 

机构地区:[1]东南大学电气工程学院

出  处:《电力系统自动化》2008年第13期104-107,共4页Automation of Electric Power Systems

摘  要:通过对2例差动保护误动案例的分析,得出实际电厂非同期合闸引起的发变组保护误动和厂用电快切过程中引起的启备变、厂高变保护的误动,并非是由于在同期合闸过程中变压器的电压发生了较大变化而产生非同期合闸涌流,而是非同期合闸电流中的非周期分量导致两侧电流互感器饱和而引起差动保护误动,并提出了相应的解决措施。This paper analyzes two mal-operation examples of actual power plants differential protection. It draws a conclusion that the reason of mal-operation by non-synchronization closing and mal-operation by power consumption of auxiliaries quicktripping, is not the non-synchronization closing inrush current caused by the transformer voltage changing more during synchronization closing, but the current transformer saturation caused by the non-periodic component of non-synchronization closing current. Some solutions are proposed also.

关 键 词:发电机-变压器组 差动保护 非同期合闸 电流互感器饱和 

分 类 号:TM772[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象