20m深水钢沉箱下黏土松动爆破振动监测  

VIBRATION MONITORING OF STANDING SHOT OF CLAY UNDER STEEL COFFER IN 20M DEEPWATER

在线阅读下载全文

作  者:汪海波[1] 周胜兵[1] 宗琦[1] 

机构地区:[1]安徽理工大学土木工程系,安徽淮南232001

出  处:《工程爆破》2007年第3期78-81,共4页Engineering Blasting

摘  要:根据要求,对合-淮-阜高速跨淮河特大桥主2#墩深水钢沉箱内黏土松动爆破进行爆破振动测试,以监控爆破振动对沉井钢沉箱的影响。通过精心设计爆破方案和振动测试方案,严格爆破施工、准确测量、认真分析测振结果,研究探讨此爆破施工条件下振动波的传播规律,提出了保证安全前提下一次最大起爆药量。According to construction requirement,vibration of the standing shot of clay under steel coffer of the 2# pier of He-Huai-Fu highway bridge was monitored,aiming to understand the influence of the blasting to the submarine steel coffer.The law of vibration wave propagation in the course of blasting,which was carefully conducted following the designed blasting program and monitoring scheme,was studied and discussed based on the accurate measurement.As a result,the paper provided the maximum security mass of ignition explosive for single shot.

关 键 词:水下爆破 钢沉箱 质点峰值振动速度(PPV) 振动监测 

分 类 号:TV542.5[水利工程—水利水电工程] O382.1[理学—流体力学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象