检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国建筑科学研究院地基基础研究所,北京100013 [2]中冶京诚工程技术有限公司,北京100176 [3]烟台港联合港埠公司,山东烟台264000
出 处:《建筑科学》2008年第7期39-42,共4页Building Science
摘 要:通过对扩底桩、支盘桩和后注浆桩三种桩型在同一工程场地的应用对比分析,结果证明,在该地区地质条件下,无论是从提高单桩承载力、减小沉降量,还是从施工质量控制、工程进度、造价角度分析,后注浆桩方案均优于扩底桩、支盘桩方案。Based on the comparative study at the same project between cast-in-situ pile with expanded branches and plates and the post grouting pile, the results show that the post grouting pile can effectively improve the pile's bearing capacity and significantly deduce the pile settlement. It is also verified that the post grouting pile has more advantages in the construction quality and efficiency, and can save more considerable expenses than the cast-in-situ pile with expanded branches and plates.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15