检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中交上海航道勘察设计研究院有限公司
出 处:《水运工程》2008年第7期143-146,共4页Port & Waterway Engineering
摘 要:在上海洋山深水港海域软土地基上大面积吹填砂后,对该地基的分层沉降观测数据进行分析,采用双曲线法和三点法推算地基最终沉降量,分析了观测时间对推算地基最终沉降量的影响。在缺少开始吹填砂到开始观测时间段内的初始沉降量情况下,结合地质资料提出土层固结度的推算方法。After large-area reclamation of sand on soft ground at Shanghai Yangshan deep water port sea area, stratified settlement data of the ground were observed and analyzed, according to which, influence of observation time on ground final settlement's prediction was studied by using hyperbolic method and three-point method. Combining with the geologic resources, the calculation method of soil layer consolidation was proposed under a lack of initial settlement data during the period from beginning of reclamation to start of observation.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.40