盾构穿越珠江的工法及保护措施  被引量:1

The Method and Protective Measures on Shield Construction Machines Excavating Through the Pearl River

在线阅读下载全文

作  者:龚成文 

机构地区:[1]广东省建筑工程集团有限公司,广州510635

出  处:《广州建筑》2008年第4期19-21,共3页GUANGZHOU ARCHITECTURE

摘  要:在广州地铁三号线珠江新城站至客村站盾构区间隧道工程施工过程中,两台盾构机先后四次穿越珠江,在穿越过程中,遇到较为复杂的地质条件,施工过程十分困难。本文结合盾构穿越珠江实际情况,阐述了盾构穿越珠江的工法及相应措施。During the work process of the shield tunnel project of ZhuJiangXinCheng station to KeCun station line of Guangzhou Metro 3rd Line, there were two shield construction machines excavating through the Pearl River safely. In the course of digging, the geographic condition is so complex that it made the construction to be more difficult. This article explains the method and related measures we took during the shield construction machines excavating through the Pearl River, according to the actual situations in site.

关 键 词:施工 保护措施 解决办法 

分 类 号:U455.43[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象