检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:龚成文
机构地区:[1]广东省建筑工程集团有限公司,广州510635
出 处:《广州建筑》2008年第4期19-21,共3页GUANGZHOU ARCHITECTURE
摘 要:在广州地铁三号线珠江新城站至客村站盾构区间隧道工程施工过程中,两台盾构机先后四次穿越珠江,在穿越过程中,遇到较为复杂的地质条件,施工过程十分困难。本文结合盾构穿越珠江实际情况,阐述了盾构穿越珠江的工法及相应措施。During the work process of the shield tunnel project of ZhuJiangXinCheng station to KeCun station line of Guangzhou Metro 3rd Line, there were two shield construction machines excavating through the Pearl River safely. In the course of digging, the geographic condition is so complex that it made the construction to be more difficult. This article explains the method and related measures we took during the shield construction machines excavating through the Pearl River, according to the actual situations in site.
分 类 号:U455.43[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.144.137.236