某银行支行业务楼托换改造设计与施工  被引量:4

Design and Construction by Supporting and Exchanging Procedure to Rebuild a Business Building of Bank

在线阅读下载全文

作  者:万墨林[1] 韩继云[1] 

机构地区:[1]中国建筑科学研究院,北京100013

出  处:《建筑结构》1997年第11期3-6,共4页Building Structure

摘  要:论述了一个大型托换工程设计施工全过程.该工程利用原有条形基础,采用空间闭合框架及组合墙梁结构作为新的传力体,受力合理,克服了新旧结构变形不协调的弊病.施工中采用机械割拆及预应力卸荷措施,保证了力的平稳转换,避免了转换时上部结构出现裂缝.实践表明,该工程使用效果良好.This paper presents a full process for design and construction by supporting and exchanging procedure to rebuild a large building project. Based on the original strip foundation of primary project, a self-enclosed frame and a combined beam-wall structure were used to form a new force-transmitting system with reasonable bearing capacity, then the uncompatible deformation occurred between the new and existing structures was avoided. In the supporting and exchanging procedure, some measures such as unloading using prestressing method, demolishing primary wall by mechanical cut-off etc. were used to ensure the stable transmission of forces in the process of demolition, the cracking on superstructure are also avioded during the exchange.

关 键 词:旧房改造 钢筋混凝土 剪力墙 托梁拆墙 闭合框架 

分 类 号:TU746.3[建筑科学—建筑技术科学] TU398.2

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象