厦门海底隧道斜井全断面帷幕注浆施工技术  被引量:1

Whole Section Curtain Grouting Technique At Inclined Shaft of Xiamen Subsea Tunnel

在线阅读下载全文

作  者:叶小兵[1] 

机构地区:[1]中铁十八局集团第一工程有限公司,河北涿州072750

出  处:《石家庄铁路职业技术学院学报》2008年第B06期51-58,共8页Journal of Shijiazhuang Institute of Railway Technology

摘  要:简述厦门海底隧道斜井,在土石交界段采用超前帷幕预注浆的方法进行堵水、加固,克服了该段围岩含水量达到50%、土体自然涌出呈流塑状、无法正常施工的困难,安全顺利地通过软弱含水的土石交界段,为隧道海底风化深槽帷幕注浆积累一些施工经验。It summarizes that the Xiamen subsea tunnel's inclined shaft uses the curtain pre-grouting method in the earth-rock junctional section to carry on the water shutoff, the reinforcement in advance, which overcomes the difficulty that surrounding rock's water content of this section reaches 50%, soil bodies gushing out naturally in liquid which denies normal construction, passes through this soft and watery section safely and gaines some construction experience of curtain grouting at weathered trough of subsea tunnel.

关 键 词:措施斜井 土石交界段 超前帷幕注浆 

分 类 号:U455.43[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象