检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:符志远[1,2,3] 谢红兵[1,2,3] 张邦圻 李焰云[1,2,3]
机构地区:[1]长江水利委员会设计院枢纽处 [2]长江水利委员会技术委员会 [3]湖北清江水电开发有限责任公司
出 处:《人民长江》1997年第7期19-21,24,共4页Yangtze River
摘 要:隔河岩电站引水隧洞环锚预应力衬砌结构为国内首例,以下介绍了该工程隧洞衬砌的设计情况。这一实践为大直径、高水头压力隧洞衬砌设计创造了新途径。研制成功的环锚(HM)系统已在该工程中应用,实现了无台座张拉施工。The prestressed ring shaped anchorage cable lining structure of intake tunnels at Geheyan power station is the first example in China.This paper presents the lining design of the tunnel. The developed ring-anchorage-cable system had been applied in this project,realizing the prestretching process without operating platform. This new technology is suitable to prestressed circular conduit both above and under ground, and has considerable economic benefits. It is worth while to recommend its application.
分 类 号:TV672.1[水利工程—水利水电工程] TV554.14
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.113