检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈玉国
出 处:《广东电力》2008年第5期67-69,共3页Guangdong Electric Power
摘 要:广东东糖集团热电厂8号煤粉炉,由于燃用煤种偏离设计煤种,在运行中出现主蒸汽温度偏高的问题,造成该炉长期不能带满负荷。为此,分析了产生这一问题的原因,并对该炉相关设备进行了改造,改造后锅炉各汽水系统参数全部合格,所改造设备经过连续7个月满负荷运行没有发生问题,改造取得了成功。As the coal in use deviated from the designed coal,the main-steam temperature of No.8 pulverized coal fired boiler of Donta Group Thermal Power Plant in Guangdong,China was overhigh in the operation,which led to the longstanding failure of the boiler to carry full load.Upon causal investigation into the problem,corresponding modification was carried out,and all the parameters of the boiler steam and water systems were up to standard thereafter.The trouble-free continuous full-load operation of the modified equipment for the following seven months showed the success of the modification.
分 类 号:TK229.63[动力工程及工程热物理—动力机械及工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145