检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张镜剑[1] 涂金良 杨耀红[1] 翟奇愚[1] 李树瑶 孙大风
机构地区:[1]华北水利水电学院
出 处:《红水河》1997年第1期7-12,共6页Hongshui River
基 金:八.五"国家重点科技攻关项目
摘 要:本文提出了一种适用于分析含压剪裂缝结构的非线性断裂力学数值分析模型──压剪钝裂纹带模型,并提出其求解方法──调整力向量法;编程分析了龙滩碾压混凝土重力坝的建基面和碾压层面的压剪断裂过程,得到了裂纹的发展过程、相应的应力、应变场及大坝各高程的材料强度储备系数,并比较分析了软化模型和脆断模型;崐最后,得出大坝上游防渗措施和保证水平施工缝具有足够的抗渗要求是保证龙滩大坝稳定安全的关键的结论。ln this paper , a new numerical analysis model of nonlinear fracture mechanics which is suitable for analysising the structure including compression-shear crack - compression-shear blunt crack band model is presented , and a new solution method which is named the adjusted force vector method is proposed. The compression - shear fracture procedures for dam foundation level and roller compacted stratification plane of Longtan rollcrete gravity dam are studied through writting programe , and the corresponding development procedures of crack , the stress and strain fields as well as the reserve factor for material strength of every elevation of the dam are obtained. Besides , softening model is compared with brittle fracture model through computing and analysising. Finally , the conclusions that the upstream seepage prevention measure and the impermeable requirement of the horizontal construction joint for the stability safety of Longtan dam are key points are drown.
分 类 号:TV642.2[水利工程—水利水电工程] TV541.1
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117