吕梁山隧道5号斜井工区施工通风方案研究  被引量:3

Study on Construction Ventilation Scheme of No.5 Inclined Shaft Working Lot of Lvliangshan Tunnel

在线阅读下载全文

作  者:沈碧辉[1] 杨其新[1] 

机构地区:[1]西南交通大学地下工程系,成都610031

出  处:《隧道建设》2008年第2期170-172,共3页Tunnel Construction

摘  要:施工通风是特长隧道施工组织设计中的一项重要任务,对特长隧道能否顺利建成具有关键性作用,以吕梁山特长铁路隧道5号斜井工区为例,根据长大斜井与正洞多工作面施工的特点,提出设计方案,并据此推算出施工风量布置风机,以选择合理通风方案,并针对该工区施工通风特点提出了建议。Construction ventilation is one of the most important aspects in the construction organization design of extralong tunnels and plays a key role for the successful completion of the extra-long tunnels. Taking No. 5 inclined shaft working lot of Lvliangshang extra-long railway tunnel as example, the authors present the features of the muhi-working face construction of the long inclined shaft and the main tunnel, propose designed construction ventilation schemes and deduct the required air volume and the ventilation fan arrangement manner so as to select the reasonable ventilation scheme. Furthermore, regarding the features of the construction ventilation of the working lot, the authors make some recommendations.

关 键 词:特长铁路隧道 斜井 施工通风 方案研究 

分 类 号:U453.5[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象