西汉高速公路秦岭Ⅰ号隧道通风斜井方案优化  被引量:7

Scheme Optimization of Raise-driven Inclined Shaft: Case Study on Inclined Ventilation Shaft of No.1 Qinling Tunnel on Xi-Han Highway

在线阅读下载全文

作  者:蔡振宇[1] 陈海波 李志平[1] 

机构地区:[1]中铁隧道集团有限公司,河南洛阳471009 [2]西汉高速公路有限责任公司,西安710060

出  处:《隧道建设》2008年第2期201-204,共4页Tunnel Construction

摘  要:坡度14%(8°)~70%(35°)、长度在300m以上、断面为55~62m^2,包含开挖、支护、二衬及中隔墙全工序作业的反打斜井,国内在此之前尚没有这样的设计和施工先例。在进行调研分析和相关模拟试验的基础上,对设计方案进行了比选优化,采用无轨常规施工设备顺利地建成了通风斜井工程。The inclined ventilation shaft of No. 1 Qinling tunnel on Xi-Han highway has a gradient ranging from 14% ( 8 ° ) to 70% ( 35 ° ), a length of more than 300 m and a cross-section area ranging from 55 m^2 to 62 m^2. Furthermore, all the construction sequences of the inclined shaft, including excavation, reinforcement, lining and central diagram installation, are to be executed in reverse direction. There are no preceding cases for the design and construction of similar inclined shafts in China. The designed scheme of the inclined shaft is optimized on basis of adequate investigations and studies and simulation tests. Finally, the inclined ventilation shaft is completed successfully by means of ordinary trackless construction machinery and equipment.

关 键 词:长斜井 反向掘进 施工方案 优化 

分 类 号:TD262.12[矿业工程—矿井建设] U453.4[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象