检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《四川水力发电》1997年第2期62-64,88,共4页Sichuan Hydropower
摘 要:气垫式调压室是用于控制水电站水力过渡过程的新型调压室,具有布置灵活、适应水位变幅大和电站负荷变化后调压室水位波动小的优点,国外已应用于控制水电站引水系统和火电站供水系统水力过渡过程。本文介绍了气垫式调压室的工作原理、参数选择及涌波计算方法。Air cushion surge chamber is a new type surge chamber which has been used to control hydraulic transient in hydropower station. It is characterized by easy arrangement,large amplitude of fluetuation for water level and small undulation of water level in surge chamber after load changes in hydropower station. The air cushion surge chamber has been used to control hydraulic transient in a diversion system of hydropower station and a water supply system of thermal power plant. The operation principle,parameter choice and surge calculation method for air cushion surge chamber are presented in this paper.
分 类 号:TV732.56[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49