大幅降低转化器一段阻力、提高转化率的抢修实践  

Practice for Emergency Repair for Significant Reduction of Resistance in the 1^(st) Stage of the Converter and Increase of Conversion Rate

在线阅读下载全文

作  者:盛强[1] 潘洪斌[1] 

机构地区:[1]铜陵有色金属集团控股有限公司金昌冶炼厂,安徽铜陵244000

出  处:《硫磷设计与粉体工程》2008年第4期15-18,共4页Sulphur Phosphorus & Bulk Materials Handling Related Engineering

摘  要:针对200kt/a硫酸Ⅰ系统转化器一段出现的阻力增大和转化率降低等问题,分析并找出了问题产生的原因,通过抢修采取措施,使转化器一段的阻力值和转化率在短时间内恢复正常,从而保持了硫酸装置的正常运行。For problems occurred in the 1st stage of I-series converter of the 200 kt/a sulfuric acid plant,such as the increase of resistance and decrease of conversion rate,causes for such problems were analyzed and identified,and emergency repair measures are taken to restore the resistance and conversion rate of the 1st stage of the converter to normal state within a short time,so as to maintain normal operation of the sulfuric acid plant.

关 键 词:硫酸生产 转化器 一段 阻力 转化率 问题 处理 

分 类 号:TQ111.16[化学工程—无机化工]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象