MSBR 7池工艺除磷影响因素的试验研究  被引量:4

Experimental study on phosphorus removal influencing factors in 7-tank process of MSBR

在线阅读下载全文

作  者:杨幸[1] 冷寒[1] 胡林龙[1] 杨雅琴[1] 汪林[1] 

机构地区:[1]重庆大学资源及环境科学学院,重庆大学西南资源开发及环境灾害控制工程教育部重点实验室,重庆400044

出  处:《环境工程学报》2008年第8期1053-1056,共4页Chinese Journal of Environmental Engineering

摘  要:在正交试验确定的相对最佳操作条件的基础上,对MSBR7池工艺除磷影响因素进行了研究,结果表明:在本试验选定的因素中,对系统除磷影响的主次顺序为COD/P>R>MLSS>COD/N;工艺要求COD/P>60,COD/N>7,但是过高的COD/P也会导致TP去除率下降;在R为0.6时系统除磷效果最好;进水COD浓度过低或过高都会导致系统除磷效果下降。Based on relatively optimum operating condition that get from orthogonal experiment, the paper analyzes primary factors that influence the removal of phosphorus in 7-tank process of MSBR. The experimental results show that the sequence of the factors that affect phosphorus removal is: COD/P〉R〉MLSS〉COD/N; the process require the COD/P〉60,COD/N〉7,but too high COD/P will deteriorate phosphorus removal; the best phosphorus removal appear when the R is 0.6; the phosphorus removal will deteriorate while the inlet COD is too low or too high.

关 键 词:MSBR 除磷 影响因素 PAOS 

分 类 号:X703.1[环境科学与工程—环境工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象