检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《西北农林科技大学学报(自然科学版)》2008年第8期218-222,共5页Journal of Northwest A&F University(Natural Science Edition)
基 金:国家冻土工程重点实验室项目(9901)
摘 要:【目的】探寻一个更为直接、细化的考虑多因素的水电站调压室设置的必要性判式。【方法】在分析和理解传统的水电站调压室设置判式的基础上,阐述了其在实际应用过程中需反复调整参数及未直接考虑材料强度的不足,依据设备允许的承压要求提出新判式,并对新判式的实用性进行了验证。【结果】利用新判式计算结果更为符合工程实际,达到了预期的研究目的。【结论】新判式可提供一个较为客观准确的"数量值",作为调压室设置与否的判据。[Objective] The studry probed into a more direct and detailed formula of setting up surge tank of hydropower station. [Method] On the basis of analysing traditional formula,which didn't take account of repeatedly adjusting parameters and the strength of material,a new formula was put forward according to the equipments' pressure-tolerance. [Result] The new formula agrees with reality ,achieving the aim of the study. [Conclusion] The new formula can provide an objective and correct value,and can be regarded as the discriminant for setting up surge tank.
分 类 号:TV732.5[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.44