三峡库区三期地质灾害防治监测预警的主要方法  被引量:13

Main Methods of Monitoring and Early-warning for Control of the Third Period of Geological hazard in Three Gorges Reservoir Region

在线阅读下载全文

作  者:季伟峰[1] 

机构地区:[1]成都理工大学环境与土木工程学院

出  处:《探矿工程(岩土钻掘工程)》2008年第7期14-17,共4页Exploration Engineering:Rock & Soil Drilling and Tunneling

摘  要:主要介绍了三峡库区三期地质灾害防治监测预警专业监测系统工程的主要任务、工作内容、监测预警工程施工和主要监测预警方法,阐述了有效的监测工作在地质灾害防治工程中的重要意义,同时介绍了研制的新型监测仪器在三峡库区三期地质灾害防治监测工程中的应用。This paper introduces the main assignments of the monitoring and early-warning system engineering for control of geological hazard, monitoring and early-warning construction and the main methods. The significance was expatiated on effective monitoring in control engineering of geological hazard, and the application of a newly developed monitoring instrument was presented, which was used in monitoring for control of the third period of geological hazard in Three Gorges reservoir region.

关 键 词:三峡库区 三期地质灾害 监测预警方法 

分 类 号:P642.2[天文地球—工程地质学] TH762[天文地球—地质矿产勘探]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象