检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]广西电力工业勘察设计研究院,广西南宁530023
出 处:《水电能源科学》2008年第4期179-180,138,共3页Water Resources and Power
摘 要:冰灾是输电线路面临的最大威胁之一,而融冰技术是防止及减轻冰灾、确保线路安全运行的重要手段。深入讨论了220 kV线路交流融冰技术的基本原理和方案,分析了各方案的利弊。通过广西电网220 kV沙塘—侯寨线路的实例分析计算,提出了初步交流短路融冰方案,供借鉴。Ice disaster is one of most severe threats to the secure and reliable operati on of transmission system. To alleviate the damage efeect of transmission line icing, ice melting technogoly must be used to remove ice. This paper considers deeply basic principles and schemes of AC short-circuited ice melting technology for 220kV transmission line, analyzes the advantages and disadvantages of all schemes. Finally, one ice melting scheme is proposed primarily for a specific transmission line named 220kV Shatang-Houzhai line in Guangxi power system.
分 类 号:TM726.1[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28