检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]河海大学电气工程学院,江苏南京210098 [2]无锡电力公司,江苏无锡214000 [3]江苏电力调度通信中心,江苏南京210024
出 处:《江苏电机工程》2008年第4期8-11,共4页Jiangsu Electrical Engineering
摘 要:结合江苏电网的实际情况,研究了电力系统低频减载的优化配置,采用多机模型的时域动态仿真法,首先用故障仿真法确定了适合低频减载分析的系统模型和参数,然后通过选择江苏电网的一个典型分区作为研究对象,提出了轮级协调动作配合后加速动作来优化调整现有的低频减载方案,以获得更高的安全性和经济性。Under-frequency load shedding, as the third defensive line of power system, is one of the most effective methods to mitigate the fi'equency collapses. This paper carries out a research on the optimal setting of under-frequency load shedding in Jiangsu power grid, and takes a measure with multi-machine model by Time-Domain Dynamic Simulation method. Firstly, the system model and its parameters are confirmed by fault simulation method. Then a subarea is taken as a representative in Jiangsu power grid and the step coordinated control strategy with the post-acceleration is proposed to adjust the existing under-fi-equency load shedding scheme for the sake of securer and more economical operation.
分 类 号:TM761.23[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249