面向对象的矿山生产计划系统的应用  被引量:1

Application of an Object-oriented System of Optimizing Mine Production Planning Based on Knowledge

在线阅读下载全文

作  者:李英龙[1,2] 胡中强[1,2] 

机构地区:[1]昆明理工大学资源开发工程系 [2]山东新城金矿

出  处:《昆明理工大学学报(理工版)》1997年第4期16-21,共6页Journal of Kunming University of Science and Technology(Natural Science Edition)

基  金:云南省应用基础研究基金

摘  要:介绍作者研制的基于知识面向对象的矿山生产计划系统在山东某金矿的应用情况方案评价指标,除沿用矿山的现行指标之外,增设了另一指标———一年的冶炼回收金属量与采矿消耗金属量之比值结果表明:应用该系统编制的矿山1994年的采矿生产计划。An object-oriented system of optimizing mine production planning based on knowledge is applied to some Gold Mine Shantung Two evaluating indexes to scheme are used One used by the mine is fluctuation value of monthly draw-ore grade,the other set up by the authors is the ratio of retrieved metal amount of smelting to depleted metal amount of mining based on a series of BP models in neural network The result shows thet this system, applied to complete the Gold Mine production planning for 1994 and compared with the production planning made by handworking,is evidently better than the latter

关 键 词:矿山 生产计划 方案评价指标 面向对象 金矿 

分 类 号:F407.162[经济管理—产业经济] TD863[矿业工程—金属矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象