检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]长江科学院水力学研究所,武汉430010 [2]长江科学院生活服务中心,武汉430010
出 处:《长江科学院院报》2008年第4期100-102,共3页Journal of Changjiang River Scientific Research Institute
摘 要:高拱坝泄洪表孔增设分流齿坎可以改善下泄水流流态和水垫塘底板的压力特性,提高消能效率,但由此带来分流齿坎的空化问题。采用减压模型试验方法对构皮滩水电站泄洪表孔分流齿坎的空化特性进行了试验研究。试验成果表明:该处空蚀可能性较大,而修改方案中,此处空化强度明显减弱且未超过空化初生阶段。The surface spillway division pier on high arch dams can better improved flow pattern and characteristics of pressure on plunge pool slabs, which can enhance the efficiency of energy dissipation. But the cavitation of the division pier can not be neglected. The cavitation characteristics of Goupitan Hydropower Station with surface spillway division pier was studied by means of vacuum tank model test, in which detection techniques of underwater noise were adopted. The results indicate that the area of division pier is much possibly damaged, but the cavitation intensity was reduced clearly to cavitation initial stage in the modified scheme of adopting a circular arc.
关 键 词:构皮滩水电站 泄洪表孔 分流齿坎 水下噪声谱级 空化
分 类 号:TV131.67[水利工程—水力学及河流动力学] TV135.23
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117