检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:胡林忠 史鸿林[1,2,1,3] 王立华
机构地区:[1]安徽阜阳建筑设计院 [2]安徽省水利部淮委水利科研院 [3]安徽省阜阳建筑设计研究院
出 处:《合肥工业大学学报(自然科学版)》1997年第4期95-102,共8页Journal of Hefei University of Technology:Natural Science
摘 要:桩基工程设计,直接影响上部结构的安全及整个工程的造价。通过钻孔挤压分支桩在阜阳商厦三期工程中的应用及试验研究表明,在同一场地、单桩竖向极限承载力相同的条件下,用钻孔挤压分支桩代替钻孔灌注桩,单位体积混凝土的竖向极限承载力标准值可提高1.31倍,桩基节约投资270万元。由此可见,在大柱网、大承载力柱桩基工程中,钻孔挤压分支桩更能充分发挥其优越性。The design of the pile foundation dire the safty of the upper structure and the cost of the engineering .Through the application and experiment of the drilling pile with squeezing branch to the 3rd period engineering of The Fuyang Business Building,it indicates that, at the same site and same vertical limit bearing pressure, by use of the drilling pile with squeezing branch to take the place of the poured drilling pile, the criterion of vertical limit pressure for per volume of the concrete will increased by 131%,and it will save 2.7 million yuan.In this awy,the drilling pile with squeezing branch will give the reins to its great superiority in the engineering of large pillar net and large bearing pressure pillar pile.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.175