检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:孟衡[1]
机构地区:[1]三峡大学三峡库区地质灾害教育部重点实验室,湖北宜昌443002
出 处:《岩土工程技术》2008年第4期178-181,共4页Geotechnical Engineering Technique
基 金:国家自然科学基金项目(50379023)
摘 要:模糊评判法作为一种评价边坡稳定性方法,其关键在于能否准确地建立评价模型,是否能准确建立模型的重点在于隶属度与各评价因子权重的确定。在实际工程中,几乎所有研究者都是采用专家打分法来定权重。虽然这一方法应用广泛,但是主观性太强,不够客观合理。采用判断矩阵分析法来确定评价因子的权重,用二级模糊评判对某工程实例进行计算分析,结果表明用该法确定权重简便,亦能较好反映边坡所处状态。The key of the evaluation method, as a method of slope stability evaluation, lies in the accuracy of the established judgment model, and the determination of the membership and the weights of the evaluation factors are important to the judgment model. In practice, the expert scoring method is widely used in weights determination, though the method is subjective. Judgment Matrix Analytical Method is used to determine the weights of the evaluation factors and Secondary Fuzzy Evaluation is used in the calculation and analysis of a real project. This method shows to be convenient and closing to the reality.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249