黑龙江洛古河站冰坝期间流量推求  被引量:1

Flow calculation of Luoguhe station during ice dam in Heilongjiang river

在线阅读下载全文

作  者:马文喜[1] 刘阳明[1] 柳恒[1] 

机构地区:[1]松辽委黑龙江水文水资源勘测局,黑龙江黑河164300

出  处:《东北水利水电》2008年第8期27-28,共2页Water Resources & Hydropower of Northeast China

摘  要:黑龙江上游多年来形成大小冰坝几十次,期间正常的水文检测无法进行。为掌握冰坝期间的出流量,文中介绍了采用建立拟测站与下游站水位相关曲线,再利用切割水位的方法进行流量推求,解决了冰坝期间测量难的问题。These years, dozens of ice dams in different sizes had formed in the upper reaches of Heilong River, which has influenced normal hydrological testing. In order to obtain the discharge during the ice dam period, it has established related hydrograph of the observation station and the downriver stations and then calculates the discharge by cutting the water level, which has solved the surveying problems during the ice dam period.

关 键 词:冰坝期 水文测验 洛沽河站 

分 类 号:TV122[水利工程—水文学及水资源] P343.1[天文地球—水文科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象