检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]Department of Electrical Engineering,Shanghai Jiaotong University
出 处:《Journal of Shanghai Jiaotong university(Science)》2008年第4期436-442,共7页上海交通大学学报(英文版)
基 金:the National Natural Science Founda-tion of China (No. 50177017);the Shanghai Key Scienceand Technology Research Program (No. 041612012)
摘 要:Because connection number can express and process synthetic uncertainties caused by various uncertainties in the transmission network planning, a connection number model (CNM) was presented to compare the values of connection number logically. This paper proposed a novel model for transmission network flexible planning with uncertainty. In the proposed planning model both certainty and uncertainty information were included, and the cost-benefit analysis method was used to evaluate the candidate schemes in the objective function. Its good adaptability and flexibility were illustrated through two examples.Because connection number can express and process synthetic uncertainties caused by various un- certainties in the transmission network planning, a connection number model (CNM) was presented to compare the values of connection number logically. This paper proposed a novel model for transmission network flexible planning with uncertainty. In the proposed planning model both certainty and uncertainty information were included, and the cost-benefit analysis method was used to evaluate the candidate schemes in the objective function. Its good adaptability and flexibility were illustrated through two examples.
关 键 词:transmission network planning UNCERTAINTY flexible planning connection number connection number model (CNM) blind number
分 类 号:TM715[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.14.255.247