检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《水力发电学报》2008年第4期101-105,共5页Journal of Hydroelectric Engineering
基 金:国家自然科学基金(50538060,50679052);博士点基金(200220056029);新世纪优秀人才支持计划和国家杰出青年科学基金(50725929)
摘 要:双排机水电站厂房布置型式是解决在高山峡谷段布置大容量多台数机组与场地矛盾的有效手段。文中以李家峡双排机水电站厂房为研究对象,对双排机厂房的结构分缝、不均匀沉降、温度场、上部双跨结构、深开挖对岸坡的影响以及结构抗震等一系列技术问题进行了深入研究。结果表明李家峡水电站双排机厂房结构设计合理,是一种值得推广的厂房结构型式。整个研究为后续的双排机厂房结构设计提供了可靠的参考。The structural array of powerhouse with double-row units arrangement may be an effective method which can settle contradiction between many high-capacity units and ground in narrow canyon. In this paper some key technical problems of Li Jiaxia hydropower house with double-row units arrangement are analyzed such as the structure joint, non-uniform settlement, temperature field, double span structure, the influence on bank slope during deeply excavating and structural earthquake resistance. According to the results of analysis. Li Jiaxia powerhouse is properly designed and this array can be used in other projects. The whole research can offer appropriate preference to structural design of new powerhouses with double-row units arrangement.
分 类 号:TV731.1[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.18