贵阳院水电站厂房设计技术综述  

Summarization of design technology of power house in Hydropower Station of GHIDRI

在线阅读下载全文

作  者:慕洪友 王强[1] 陈本龙[1] 

机构地区:[1]中国水电顾问集团贵阳勘测设计研究院,贵州贵阳550008

出  处:《水电勘测设计》2008年第2期6-9,共4页

摘  要:贵州地区多高山峡谷,地下岩溶发育。在水电站厂房设计中常常遇到狭窄河谷的厂房布置、厂房高边坡、岩溶地区厂房深基坑和高尾水变幅结构设计等问题。贵阳院在水电站厂房的设计中,探索出适宜本地区厂房的布置型式,厂房高边坡及岩溶基坑处理措施,适应高尾水变幅和快速施工的厂房结构型式,成功解决了峡谷及岩溶地区厂房设计的关键技术问题,促进了贵州省的经济建设及社会发展,为水电站厂房设计技术发展做出了积极的贡献。Guizhou Province is famous for high mountains 、gorges and well developed karst. In the design course of power house, strait river valley and high slope,deep foundation pit in karst area and high tailwater are encountered. By exploring feasible layout of power house in the area, treatment measures of high slope and foundation pit in karst area and structural types suitable for high tailwater fluctuation range and rapid construction, designers of GHIDRI has solved key technological difficulties in gorge and karst area successfully, which promotes the economical and social development of Guizhou Province and makes an active contribution to the development of power house design of Hydropower Station.

关 键 词:狭窄河谷 水电站厂房布置 高边坡处理 岩溶基坑处理 高尾水变幅 新结构 

分 类 号:TV736[水利工程—水利水电工程] TU27[建筑科学—建筑设计及理论]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象