105m钢-混凝土组合箱梁长距离运输架设技术  被引量:2

Techniques for Long-Distance Transportation and Erection of 105-m Span Steel and Concrete Composite Box Girders

在线阅读下载全文

作  者:陈理平 黄勇 

机构地区:[1]中铁大桥局股份有限公司上海分公司,上海200071

出  处:《桥梁建设》2008年第4期74-77,共4页Bridge Construction

摘  要:上海长江隧桥105 m钢-混凝土组合箱梁重2 300 t,采用"天一号"吊船海上长距离运输85海里到桥位架设,运输风险大,架设精度要求高、难度大,介绍大跨度组合梁的运输、架设技术。The 105-m span steel and concrete composite box girders, weighing 2 300 t each piece, for the Shanghai Changjiang River Tunnel and Bridge Project were transported by sea by Tianyi Lifting Vessel at a long distance of 85 nautical miles to the Bridge site where the girders were then erected by the Vessel. The risk of transportation of the girders in such a condition was great, the precision requirements for erection of the girders were high and the erection was difficult. In this paper, the techniques for the transportation and erection of the long span composite box girders are dealt with.

关 键 词:组合箱梁 运输 架设 桥梁施工 

分 类 号:U445.467[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象