马家楼站车站主体围护结构锚索设计与施工  被引量:1

Anchor Cable Design and Installation for the Excavation Pit Support of Majialou Station

在线阅读下载全文

作  者:熊竺[1] 

机构地区:[1]中铁第四勘察设计院集团有限公司,武汉430063

出  处:《都市快轨交通》2008年第4期64-67,共4页Urban Rapid Rail Transit

摘  要:利用设计软件FRWS4.0,对北京地铁4号线马家楼站主体基坑围护结构进行计算,针对不同桩型分别得到对应的锚索拉力值;试验数据证明,预应力锚索是可靠的,在施工过程中进行锚索张拉试验,表明锚索的施工可以满足设计要求,主体结构的施工工期大大缩短,工程收到了预期的效果。Software FRWS 4.0 was used to calculate the excavation pit support of Majialou Station on Beijing subway Line 4. Tensile forces in anchor cables for different types of piles were obtained respectively. During the process of construction, pulling out test of the anchor cables was performed and results of the test indicated that the installed anchor cables were reliable and could meet design requirements.

关 键 词:基坑 桩型 锚索拉力值 锚索张拉试验 

分 类 号:U231.4[交通运输工程—道路与铁道工程] TU712.3[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象