检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国水电顾问集团贵阳勘测设计研究院
出 处:《中国勘察设计》2008年第8期6-9,共4页China Engineering Consulting
摘 要:在水电开发建设中,移民安置问题是我国目前和将来水电开发面临的最为重大的问题。以国务院第471号令为契机,转变思想认识,用"大水库"观念指导水库专业的建设与管理,对我国水电开发事业的可持续发展具有重要的意义。In the course of hydropower development, resident relocation is the most important problem to be confronted when developing hydropower at present and in the future. We should change our emotional recognition and direct the building and management of reservoir specialty with "large reservoir" conception by taking the chance of the 47 lth document released by State Council, this would have magnificent meaning to the sustainable development of hydropower development.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3