检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国水电工程顾问集团公司,北京100011 [2]中国水电顾问集团成都勘测设计研究院,四川成都610072
出 处:《水力发电》2008年第8期81-83,113,共4页Water Power
摘 要:初步介绍了目前国内外深厚覆盖层上建造面板堆石坝的发展状况,针对多诺、察汗乌苏、那兰3座在建、已建的坝高超过100m的深厚覆盖层上的面板堆石坝的防渗体系设计情况进行对比研究,总结目前国内深厚覆盖层上高面板堆石坝防渗体系设计方法及关键技术要点以及常用的方案设计研究方法,提出防渗体系设计中应考虑的影响因素。This paper gives a brief introduction to the present development situation of the construction of faced roekfill dams on deep overburden layer both at home and abroad. Based on the comparison and analysis of the design of flood control systems of three high face rockfill dams of Duonuo, Chahanwusu (exsisting), Nalan (under construction) dams, each with a height of over 1130 meters and constructed on the overburden layer, this paper also sums up the design methods, key technologies and common scheme design which are adopted in the design of seepage control system for high face rockfill dams on the deep overburden layer in China, and then it also puts forward some affecting factors that should be taken into account in the design of seepage control system.
分 类 号:TV641.43[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.40