青川县堰塞湖应急排险施工组织及管理  被引量:1

Construction organization and construction management for emergency risk-elimination of landslide dams in Qingchuan County

在线阅读下载全文

作  者:任馨[1] 党永平[1] 

机构地区:[1]中国人民武装警察部队水电第三总队,四川成都610036

出  处:《水利水电技术》2008年第8期27-30,共4页Water Resources and Hydropower Engineering

摘  要:介绍了青川县境内青竹江和红石河流域由于四川汶川"5.12"大地震形成的东河口、红石河、石板沟等3个主要堰塞湖的位置、形体特征、地质构成情况,分析了3个堰塞湖应急排险处理的难点、特点,重点总结了3个堰塞湖处理过程的施工方法、现场组织协调、资源配置等情况,供以后进行类似的应急处理施工参考。The locations, body features and geological formations of Donghekou, Hongshihe and Shibagou Landslide Dams within the watersheds of Qingzhujiang River and Hongshihe River created during "5.12" Wenchuan Earthquake in Sichuan Province are described along with the analysis on the difficulties, characteristics and focuses of the emergency treatment of the landslide dams, and then the emergency construction method, construction organization and disposition of all the construction forces concerned are also summarized herein, which can be used as references for the similar emergency construction project in the days to come.

关 键 词:堰塞湖 排险 施工组织 施工管理 青川县 四川省 

分 类 号:P642.2[天文地球—工程地质学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象