青川县红石河堰塞湖抢险施工与思考  

Consideration and construction of emergency construction of Hongshihe Landslide Dam In Qingchuan County

在线阅读下载全文

作  者:李浩浩[1] 任馨[1] 杨华斌[1] 

机构地区:[1]中国人民武装警察部队水电第三总队,四川成都610036

出  处:《水利水电技术》2008年第8期50-51,62,共3页Water Resources and Hydropower Engineering

摘  要:通过对青川县红石河堰塞湖的施工处理过程的介绍,阐述了堰塞湖处理过程中的一些基本原则和施工处理措施。由于红石河堰塞体主要是由松散土夹石构成,且普遍存在大孤石,在此次堰塞湖处理中有较强的代表性,加之震后多数山体整体结构变得较为松脆,如何将抢险施工与今后永久处理方案相结合,如何争取将更多的工作做在前面以及今后堰塞湖处理和抢险施工中需要注意的问题等方面笔者都提出了一些建议。Based on the introduction of the emergency construction of Hongshihe Landslide Dam in Qingchuan County, some basic principles and construction measures on the emergency treatment on the landslide dam is described herein. As Hongshihe Landslide dam is mainly composed of loose soil with debris and some large stones, the emergency treatment on the landslide dam has a more typical representativity. Furthermore, the whole structures of the most of the mountain bodies therein became more loose and brittle after the earthquake concerned, and then some suggestions are put forward not only on how to combine the emergency construction with the permanent treatment measures and how to do more work ahead, but also on some key points which are necessary to be considered in the construction treatments or emergency construction of land- slide dams in the days to come.

关 键 词:红石河堰塞湖 抢险施工 思考 

分 类 号:P642.2[天文地球—工程地质学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象