多煤层开采覆岩破断过程的模型试验与数值模拟  被引量:20

MODEL TEST AND NUMERICAL SIMULATION OF OVERBURDEN FAI-LURE PROCESS IN MULTI-COAL SEAM MINING

在线阅读下载全文

作  者:夏筱红[1] 隋旺华[1] 杨伟峰[1] 

机构地区:[1]中国矿业大学资源与地球科学学院,徐州221008

出  处:《工程地质学报》2008年第4期528-532,共5页Journal of Engineering Geology

基  金:国家自然科学基金项目(40372123);中国矿业大学青年科研基金项目(OF4468)

摘  要:首先分析了研究区煤矿山西组煤层剖面和水文地质特征,针对多煤层联合开采的特点和覆岩的工程地质特征,采用工程地质力学模型实验、数值模拟计算相结合的综合研究方法,分析了多煤层开采的采动影响及岩层动态断裂机理,得出了有关岩层移动参数和多层煤同采时应力分布状态,计算得到了多煤层开采垮落带与导水裂隙带的发育高度分别为32m和81.5m,导水裂隙带高度影响范围已经达到风化带,未形成切冒,局部穿透粘土层。A Firstly, the Shanxi formation coal seam sections and hydrogeological features were analysed. Based on characteristic of the associated mining of multi - coal seams and the engineering geological characteristics of overburden, the mining impact pattern of multi - coal seam mining and the dynamic fracture mechanism of overburden were characterized. A comprehensive research method combining engineering geological mechanical model test and finite element numerical simulation was applied. The related strata movement parameters, stress distribution and influence area of multi - coal seam mining were obtained as follows : strike boundary angle = 62°, full extraction coefficient =0.95, the greatest subsidence angle =82°, horizontal movement factor =0.39, and deviation of inflection point/mining deep =0.12. The stress distribution of multi - coal seam mining was analysed. The stress concentrated locations at the roof, bottom and surround rocks were determined. The maximum stress concentrations were on the coal wall lines. The bottom stresses tended to transfer into the coal pillar. The development height of caving zone and water flowing fractured zone of multi - coal seam mining were calculated. They were 32 m and 81.5m respectively. The assess of influence degree of coal layer safety mining was that, for the area of influence of height of crack belt reached to the belt of weathering, which didnt form the transfixion, and it penetrated the clay layer partially, there existed the possibility of sand boil when stoping. Some measures for mine water prevention and control should be used. The method of small work face, mining separate layers, mining thickness below the local strictly limit should be adopted. The results were confirmed with the field tests and assured that no geologic hazard would occur.

关 键 词:多煤层开采 安全开采 工程地质力学模型 数值模拟 

分 类 号:TD82[矿业工程—煤矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象