高拱坝施工的温控数据库系统  被引量:8

Temperature control database system for high arch dam construction

在线阅读下载全文

作  者:李洋波[1] 黄达海[2] 

机构地区:[1]武汉大学水利水电学院,湖北武汉430072 [2]三峡大学土木水电学院,湖北宜昌443002

出  处:《武汉大学学报(工学版)》2008年第4期52-55,共4页Engineering Journal of Wuhan University

基  金:湖北省自然科学基金创新群体项目(编号:2006ABC004)

摘  要:依托溪洛渡高拱坝工程,整理了高拱坝温控信息类型,提出了局部的温控措施要求,形成大量的个性化温控信息,吸纳了高拱坝施工过程与温度场仿真成果,构建成温控数据库,利用Direct3D三维图形接口和Access数据库,在Visual C++编程环境下,开发了温控数据库系统,形成初步成果,该成果适合现场预警和快速反应,可为现场决策提供参考.Based on the Xiluodu high arch dam project, the types of temperature control informations are sum- marized; and many rules of local temperature control methods are made; the output of high arch dam geometrical and physical simulation is accepted; and the temperature control database is built. Developed by Visual C+ + programming environment with Direct3D 3-D graphic tool and Access database, the program of temperature control database system can provide services for decision-making in the construction site.

关 键 词:高拱坝 温控信息 温控数据库 DIRECT3D ACCESS 

分 类 号:TV512[水利工程—水利水电工程] TV544.91

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象