检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]武汉大学水利水电学院,湖北武汉430072 [2]三峡大学土木水电学院,湖北宜昌443002
出 处:《武汉大学学报(工学版)》2008年第4期52-55,共4页Engineering Journal of Wuhan University
基 金:湖北省自然科学基金创新群体项目(编号:2006ABC004)
摘 要:依托溪洛渡高拱坝工程,整理了高拱坝温控信息类型,提出了局部的温控措施要求,形成大量的个性化温控信息,吸纳了高拱坝施工过程与温度场仿真成果,构建成温控数据库,利用Direct3D三维图形接口和Access数据库,在Visual C++编程环境下,开发了温控数据库系统,形成初步成果,该成果适合现场预警和快速反应,可为现场决策提供参考.Based on the Xiluodu high arch dam project, the types of temperature control informations are sum- marized; and many rules of local temperature control methods are made; the output of high arch dam geometrical and physical simulation is accepted; and the temperature control database is built. Developed by Visual C+ + programming environment with Direct3D 3-D graphic tool and Access database, the program of temperature control database system can provide services for decision-making in the construction site.
关 键 词:高拱坝 温控信息 温控数据库 DIRECT3D ACCESS
分 类 号:TV512[水利工程—水利水电工程] TV544.91
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.185