进一步提高狮子山铜矿磨机生产能力的研究  被引量:3

Further Improvement of Mill Capacity in Shizishan Copper Mine by Applying Accurate Ball Charging

在线阅读下载全文

作  者:肖庆飞[1] 石贵明[1] 罗春梅[1] 曾桂忠[1] 段希祥[1] 

机构地区:[1]昆明理工大学国土资源工程学院,云南昆明650093

出  处:《矿冶工程》2008年第4期32-34,38,共4页Mining and Metallurgical Engineering

摘  要:应用精确化装补球方法,开展了提高狮子山铜矿磨机生产能力的研究。工业试验结果表明,采用ф90、ф80和ф60球按35∶35∶30配比进行精确化装补球,磨机生产率由83.34t/h增至91.84t/h,选厂生产规模由2000t/d提高至2204t/d,在提高处理量时并未影响选矿指标,且全厂电耗和磨矿介质单耗都有大幅度下降。Applying a method of accurate loading and addition of milling balls, research to raise the mill capacity of Shizishan Copper Mine was carried out. The industry experiment shows that, when a fixed weight ratio of charged balls with diameters of 90, 80 and 60 mm was regulated accurately as 35: 35: 30, the production capacity of the mill was increased from 83.34 t/h to 91.84 t/h, and therewith, the capacity of the total plant was increased from 2 000 t/d to 2 204 t/d, yet, the mineral separation targets remained unaffected despite the increasing capacity, meanwhile, the electricity consumption and grinding media consumption per unit are decreased obviously.

关 键 词:精确化装补球方法 磨机生产能力 电耗 介质单耗 

分 类 号:TD921[矿业工程—选矿]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象