2010-2020年山西电网主结构规划探讨  被引量:3

Discussion on Shanxi Main Electric Network Frame Planning From 2010 to 2020

在线阅读下载全文

作  者:续建国[1] 张永春[1] 楼鸿祥 刘愈倬[1] 杨晓茹[1] 

机构地区:[1]山西电力科学研究院,山西太原030001

出  处:《山西电力》2008年第4期1-4,共4页Shanxi Electric Power

摘  要:探讨了山西电网主结构规划,认为经过10 a急速发展期之后,2010-2020年山西电网将迎来平稳发展期。2010-2020年山西电网主网架以500 kV南北纵向通道为主,横向通道适当联络。500 kV电网主网架形成并不断加强的同时,全省电网逐步解开500/220 kV电磁环网,实现分层分区运行。Concerning the rapid development of Shanxi electric network in the past 10 years, the development ot Shanxi electric network will be stable. The planning of main frame is discussed. From 2010 to 2020, the main grids of Shanxi electric network is 500 kV channel from north to south, and the channel from east to west is secondary. When 500 kV electric main frame becomes more and more strength, 500/220 kV electromagnetic circuits are untied to realize de-lamination and partitionarea supply.

关 键 词:山西电网 规划 2010—2020年 

分 类 号:TM727[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象