捷制500MW机组冷却塔冬季结冰原因分析及改造  

Analysis of the Cooling Tower Freezing in the 500MW Unit Made in Czech and the Renovation of the Suspending Devices

在线阅读下载全文

作  者:张小三[1] 梁卓文 李庆华[1] 胡政 

机构地区:[1]山西电力科学研究院,山西太原030001 [2]山西省神头第二发电厂,山西朔州036011

出  处:《山西电力》2008年第4期34-36,38,共4页Shanxi Electric Power

摘  要:针对神头第二发电厂捷制500MW机组1号、2号双曲线自然通风冷却塔冬季严重结冰及淋水层内立柱、淋水装置支撑梁、塔筒内壁水泥变酥、脱落、钢筋腐蚀,淋水填料严重脱落进行了分析,从提高机组真空度及循环水冷却效果出发,提出了一些整改措施及应注意的问题。Some innovation mesures and notice are put forward to increase the vacuum and improve the cooling effect of the circling water, based on the analysis of the great freezing of the hyperbola-natural-ventilation-cooling tower, and the shedding and softening of the concrete on the inner pylon, the inner wall, and on the trickle-cooler-support girder of the tower, and the analysis about the the corroding of the steel bar, and the severe shelling of the shower suffer.

关 键 词:冷却塔 结冰 淋水填料 整改措施 

分 类 号:TK264.1[动力工程及工程热物理—动力机械及工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象