“九五”前兆台站与“十五”前兆台网的整合研究  被引量:7

RESEARCH ON INTEGRATING NINTH FIVE-YEAR PLAN PRECURSOR STATIONS INTO TENTH FIVE-YEAR PLAN PRECURSOR NETWORK

在线阅读下载全文

作  者:王军[1] 赵刚[1] 何案华[1] 郭藐西[1] 郭柏林[1] 秦久刚 

机构地区:[1]中国地震局地壳应力研究所,北京100085 [2]地壳运动监测工程研究中心,北京100036

出  处:《大地测量与地球动力学》2008年第4期125-130,共6页Journal of Geodesy and Geodynamics

基  金:中国地震局2007年度地震行业科研专项(200708045)

摘  要:提出4套"九五"台站与"十五"台网的整合方案,利用这4种方案可以方便地将"九五"仪器接入"十五"地震台网中。其中专用网络接口方式已经在北京白家疃地震台试运行,取得了良好的效果。It's urgent to integrate the Ninth Five-year Plan digital precursor stations into the Tenth Five-year Plan precursor network after the completion of the Tenth Five-year network. Corresponding to different station conditions, four solutions are proposed to conveniently connect the Ninth Five-year Plan earthquake instruments to the Tenth Five-year Plan earthquake precursor network. Among them the special network interface solution has been applied in Baijiantuan earthquake station in Beijing and has quite an effect.

关 键 词:“九五” “十五” 前兆台网 串口仪器 GPRS/CDMA 

分 类 号:P315.78[天文地球—地震学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象