检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]哈尔滨空调股份有限公司,哈尔滨市150088 [2]乌拉山发电厂,内蒙古乌拉山市014407
出 处:《电力建设》2008年第9期60-63,共4页Electric Power Construction
摘 要:通常以迎面风速作为唯一的变量对火电厂空冷凝汽器进行优化计算。增加虚拟厂界距离作为第2变量,厂界噪声55dB(A),并将虚拟厂界设为距平台分别为200,250,300,350,和400 m的距离,求得各个距离上的最低年总费用,通过对这些费用的分析,即可得到最佳厂界距离上的ACC最优设计方案。同时对目前常用的2种翅片管的优化结果及规律做了对比,还分析了成本电价、贷款利率、设备价格变化对优化趋势的影响。Generally, head-on wind velocity is the only variable used in power plant air-cooled condenser (ACC) optimization. By adding virtual plant boundary as the second variable and the noise at plant boundary to 55 dB (A), and setting virtual plant boundary to 200 m, 250 m, 300 m, 350 m, and 400 m from the platform, respectively, the minimum annual total costs at each distance can be calculated. Through cost analyses, the optimum ACC design on optimum distance can be achieved. In addition, comparison of two commonly used fin tubes optimization results are carried out, and the effects of electricity cost tarrif, loan rate, and equipment price variations on optimization trend are also studied.
分 类 号:TU926[建筑科学—建筑设计及理论] TK264.11[动力工程及工程热物理—动力机械及工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.50