检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]吉林省水利水电勘测设计研究院,吉林长春130021 [2]吉林省引嫩入白工程建设管理局,吉林白城137000
出 处:《水利水电技术》2008年第9期92-94,共3页Water Resources and Hydropower Engineering
摘 要:为了使工程安全稳定运行,提出对于采用平直出水流道的大型混流、轴流泵站工程必须进行水力过渡过程分析计算,并提出安全可靠的断流设施,同时确定合理的关闭时间。此外,提出国家标准《泵站设计规范》对水泵出水流道断流设施应优先选择运行可靠、调节灵活、结构简单的液控蝶阀的建议。It is put forward that analysis and calculation on the hydraulic transient must be made for the large mixed flow and axial flow pumping stations with flat and straight water outlet conduits, so as to ensure safe and stable operation of the project concerned. Furthermore, safe and reliable cutoff facilities must be selected and reasonable closing time must be determined as well. Moreover, it is proposed that the butterfly valve of reliable operation, flexible adjustment and simple structure should be prescribed as the firstly selected cutoff facility for the outlet conduit in the "Design code for pumping station".
分 类 号:TV675[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117