检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]淮海工学院土木工程系,江苏连云港222005
出 处:《世界桥梁》2008年第3期58-60,65,共4页World Bridges
基 金:浙江省交通厅科技计划项目(2008H01);淮海工学院自然科学基金项目(Z2006045)
摘 要:以某高速公路立交桥空心板梁边板加固为例,介绍预应力CFRP加固技术的特点、计算及施工工艺。实践表明:应用预应力CFRP加固技术,桥梁结构承载力可满足加固设计要求,且裂缝闭合,恢复部分挠曲变形;可提高构件刚度,桥梁结构的内力分布得到明显改善,取得了满意的综合加固效果。Taking the strengthening of side slabs of the hollow slab girder of an expressway interchange as an example, this paper presents the characteristics, calculation and workmanship of the prestressing CFRP (carbon fiber reinforced polymer) technique for bridge strengthening. Practice proves that by applying the technique, the carrying capacity of the strengthened bridge structures can meet the design requirements, the cracks in the structures can be closed, part of the flexure deformation can be restored, the rigidity of the structural elements can be raised, the internal force distribution of the structures can be significantly improved and eventually the satisfactory comprehensive strengthening effect can be achieved.
分 类 号:U445.72[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28