检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王亚菊
出 处:《南水北调与水利科技》2008年第5期77-79,共3页South-to-North Water Transfers and Water Science & Technology
摘 要:丹江口水利枢纽右岸混凝土坝转弯坝段在平面上呈凸向下游的反弧形,初期工程中横缝进行了灌浆。在气温影响下,夏季坝体被挤压向下游变形,坝基上游端部受拉,扬压力增大;冬季挤压消失、变形恢复常态。为消除转弯坝段长期因受温度周期性变化而产生的坝体稳定及应力不利的变形,大坝加高前采取了消除横缝间连接的锯缝施工方案,解决了转弯坝段反向变形问题,施工取得了良好效果。Concrete dam turning section on right bank of the Danjiangkou Dam Project shows anti-arc shape of convex to the downstream on the plane, Influencing by temperature, the dam was squeezed to the lower reaches of deformation in summer, deformation restored normality in winter. In order to eliminate deformation of darn turning section because of cyclical changes of temperature, saw seam construction program of eliminating link between the joints was taken before heightening darn, resolving problem of reverse deformation of the dam turning section, the construction has achieved good results.
分 类 号:TV54[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.137.165.75